© 2023. All rights reserved
Prev
0
Descriptive technical report of the actions planned for the connection roads of the future solar plant “áurea”, t.m. Roca de la Sierra (Badajoz)
22 May 2023
Next
0
Environmental qualification report of the wastewater treatment system.
22 May 2023
Conducting environmental pre-feasibility studies of renewable energy projects within the national scope.
Environmental Engineering

Project Year
2022
Year of Work
2022
Location
Various locations in Spain
Project Description
Environmental Feasibility Report, in order to evaluate the environmental compatibility of the territory for the installation of the intended project.




