© 2023. All rights reserved
Prev
0
Technical feasibility report for overhead crossing of the evacuation power line of the photovoltaic solar plant.
22 May 2023
Next
0
Engineering and consulting services for drafting the necessary documentation for the Castilblanco de los Arroyos dam.
22 May 2023
Technical feasibility report for overhead crossing of the evacuation power line of the photovoltaic solar plant.
ENERGY AND INDUSTRY

Project Year
2022
Year of Work
2022
Location
Alameda (Málaga)
Project Description
Preliminary project for the technical definition of the different infrastructures necessary to make use of public water for the irrigation of olive plantations, reusing treated water from the WWTP for irrigation.




